BY DOWNLOADING OR USING THESE SPECIFICATIONS, THE USER SHALL HEREBY AGREE TO THE FOLLOWING:

THE USER IS TO THOROUGHLY READ THE SPECIFICATIONS AND UNDERSTAND ITS INTENTIONS AND SCOPE PRIOR TO ITS USE. WHEN ADOPTING THESE SPECIFICATIONS, APPROPRIATE MODIFICATION TO THESE SPECIFICATIONS SHALL BE APPLIED TO SUIT THE SPECIFIC REQUIREMENTS FOR THE INTENDED SCOPE OR PURPOSE OF THE PROJECT. CONSIDERABLE TIME, EFFORT AND EXPENSE HAVE GONE INTO THE COMPILATION OF G&P STANDARD SPECIFICATIONS. IN USING THIS SPECIFICATIONS, HOWEVER, THE USER ACCEPTS AND UNDERSTANDS THAT NO WARRANTY IS EXPRESSED OR IMPLIED NOR ANY LIABILITY UNDERTAKEN TO THE DISTRIBUTORS OR ANY PARTY BY G&P.

 
 
Note: Titles highlighted in blue colour is available for download online. The following downloadable documents are in pdf format. You may not be able to view the documents if your computer does not have any pdf reader programme installed.

 
List of Specifications
 
List of Specifications under Development
 
List of Checklists
 
 
1.
Checklist for Supervision of Micropile Construction
 
2.
Checklist for Supervision of Pile Driving
 
3.
Checklist for Static Pile Load Test Supervision
 
4.
Checklist for High Strain Dynamic Pile Testing (HSDPT)
  5. Checklist for Information Required before CPT/CPTU Tests
  6. Checklist for Borehole Testing
  7. Checklist for 1D Consolidation Laboratory Test
  8. Checklist for Geotechnical Site Inspection
  9. Checklist for Site Visit
  10. Checklist for Bored Cast-In-Place Pile
  11. Checklist for Supervision of Sheet Pile Installation (Excavation Work)
  12. Procedure for Pile Integrity Test
  13. Checklist for Isotropic Consolidated Undrained Shear Strength in Triaxial Compression (CIU) Laboratory Test
  14. Checklist for Strutting Works
  15. Checklist for Pull Out Test (Rock Bolt)
  16. Checklist for Supervising of Soil Nailing Work
  17. Checklist for Rock Toe
  18. Checklist for Concrete Casting
  19. Checklist for Earthwork
  20. Checklist for Packer Test
  21. Checklist for Supervision of Stone Column Construction
  22. Checklist for Draft SI Factual Report
  23. Checklist for Laboratory Visit
  24. Checklist for Supervision of Earthworks
  25. Checklist for Pull Out Test (Soil Nail)
  26. Checklist for Jack-In-Pile Supervision
  27. Checklist for Point Load Test
  28. Checklist for Interpretation of Instrumented Test Pile Result
  29. Checklist for Interpretation of High Strain Dynamic Pile Test (HSDPT)
  30. Checklist for Supervision of Ground Anchor Construction
  31. Checklist for Vertical Drain Installation
  32. Checklist for Design of Geogrid for piled Embankment to BS8006
  33. Checklist for Filter Design
  34. Checklist for Concrete Mix Design
  35. Checklist for Methodology for Evaluation of Soil Parameters from Pressuremeter Test (CLAYS)
  36. Supervision of Excavation & Casting of Bliding Concrete
  37. Procedure for Design of Embankment
  38. Procedure for Determination of Bending Moment
  39. Procedure for Shear Strengths Parameters from Back-Analysis of Single Slips
  40. Procedure for Estimation of Travel Distance Angle for Rapid Landslides
  41. Design of Reinforced Soil Wall
  42. Checklist for Supervision of Reinforced Soil Wall
  43. Interpretation of CIU Test
  44. Guidelines of Geophysical Survey Supervision
  45. Checklist For Bored Pile Instrumentation Installation
  46. Earth Pressure Induced by Compaction
  47. Checklist for Lateral Pile Load Test Supervision
     

     
   
 
 
 
 
   

Copyright © 2008-2012 G&P Geotechnics Sdn Bhd. All Rights Reserved.